MISSION-CRITICAL PLANNING / INTERVAL DISPATCH
Cut demand charges.
Keep your backup reserve.
Optimize battery schedules at the meter’s actual 15-, 30- or 60-minute interval. Check every energy balance, reconstruct the bill, and take the full study into a design review.
1. Meter data
Synthetic January 2026 demonstration
2,976 intervals · 15 minutes · 1 billing month(s)
CSV format and billing calendar
Columns: timestamp,load_kw. Optional third column: energy_rate in $/kWh overrides the energy schedule. Load is interval-average net import before battery dispatch; exports and negative prices are unsupported.
Use ISO interval-start timestamps with explicit offsets, such as 2026-01-01T00:00:00-05:00. Local timestamp fields define billing month and peak hours. Include correct daylight-saving offsets. Gaps, duplicates, missing values and misaligned intervals are rejected. Supply full months for full-month bills; partial inputs show only their energy plus modeled monthly demand components.
2. Battery and continuity
Required reserve: 521.6 kWh. The higher of your reserve floor and the energy needed for backup is enforced at every interval. Final charge must be at least starting charge. Use end-of-life usable capacity for conservative studies.
3. Utility tariff
Zero history means an assumed zero peak, not a verified absence. Ratchets apply to noncoincident demand and expire after 11 months. No holiday calendars, demand tiers, coincident-event charges, taxes, fixed charges or minimum bills. Those tariff components require separate analysis.
4. Solve and audit
“Optimize on server” sends this study’s interval data and settings to MicrogridModeler’s solver. This endpoint does not save or publish the study or log its contents. Privacy details.
HiGHS linear optimization, up to 35,136 intervals. Perfect foresight of supplied loads and rates. Savings are a planning bound; this is not a deployed controller or an electrical protection study.
One study. An inspectable answer.
The demo includes short demand spikes that hourly averaging can hide. Run it, then import your meter data.
- Optimize energy and both demand-charge components together.
- Enforce backup reserve and battery power limits.
- Reconstruct costs independently from interval dispatch.
- Export the schedule, inputs and mathematical model.
The workspace evaluates fixed battery assets. Use System sizing for the broader microgrid design.
What this answers
For the supplied intervals and supported tariff, what fixed-battery schedule minimizes energy + demand + linear wear cost while preserving the specified backup reserve? The solver must prove optimality and pass an independent physical and bill audit before a result is shown.
It does not establish superiority over ETAP, Xendee or Schneider. Export the same data and constraints for a fair comparison. Read the evaluation guide.
Studies remain in this page’s memory until saved. Reloading clears them. The standard modeler’s hourly simulation and this interval optimizer are distinct calculations.