Plan for outages shorter than a day

The Modeler’s “Must survive an outage” selector now includes 4, 8, 12, 16 and 20 hours alongside the existing 24-hour, 48-hour, 3-day and 1-week options.

  • New resilience analyses report 16 and 20-hour survival alongside 4, 8, 12, 24, 48 and 72 hours.
  • Saved custom outage durations remain visible in the selector, and the displayed survival target reflects the saved probability.
  • Off-grid guidance explains that the test measures critical-load survival using on-site assets, starting from the dispatched battery state of charge.

Existing projects keep their saved settings. Survival results depend on the critical-load fraction, start times, available fuel and system design; selecting a target does not certify a design.